Monon Grade Crossing Signal


Completion

The partially-assembled mast was moved outside with the help of a couple friends and set into place. The lamp assembly was then placed at the top of the pole. All that remained to do was installation of the sign. After receiving the completed sign and decals from the printer, the signal was reassembled. The following night, the lights were wired and mounted.
The end result is seen here.

PREVIOUS PAGE
BACK


Photo courtesy Pat Scott


All images © 2009 Scott R. Ikemeyer, unless otherwise noted.